Third Floor nearly ready

The third floor block work is underway and Second Floor floor trusses are installed.  Third Floor floor trusses will be installed soon!

white cliffs 1-31-15-4

white cliffs 1-31-15-7

white cliffs 1-31-15-9

Leave a Reply